


The top of the model was cast in plaster first and left to set for 15 min. The same process was copied for the bottom half of the model to produce a complete mould.
The mould takes four days to dry out then will be ready to have porcelain poured in.


The top of the model was cast in plaster first and left to set for 15 min. The same process was copied for the bottom half of the model to produce a complete mould.
The mould takes four days to dry out then will be ready to have porcelain poured in.
No comments:
Post a Comment